Mud Treatment System
- Drilling Fluid Solids Control System
- Water-based Mud Treatment System
- Oil based Mud Treatment System
- Trenchless Mud Treatment System
- Mud Mixing System
- Drilling Fluid Cooling System
- Truck mounted Mud Circulation System
- Barite Recovery System
Solids Control Equipment
- Mud Shale Shaker
- Degasser
- Mud Cleaner
- Centrifuge
- Mud Agitator
- Mud Gun
- Jet Mud Mixer
- Centrifugal Pump
- Shear Pump
- Spray Pump
- Vacuum Pump
- Mud Gas Separator
- Ignition
- Drilling Cuttings Dryer
- Filter Press
- Conveyor
Drilling Tools and Spare Parts
- Mud Shale Shaker Spare Parts
- Centrifugal Pump Spare Parts
- Mud Pump Spare Parts
- Centrifuge Spare Parts
- Mud Tank Bottom Valve
- Mud Hopper
- Mud Tank Level Alarm
- Polyurethane Cyclone
- Electric Motor
- WPS Reducer
- Mud Tank Union
- Explosion-proof Water Tank Heater
Tank and Steel Structure
Phone: 86-29-88680837
Mail: sales@hlsolidscontrol.com
Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
1000 meters Solids Control System
Product Overview:
• Large storage capacity, large processing capacity, improve drilling efficiency.
• Four-stage separation of solid particles to meet the requirements of different well depths for drilling fluids.
• Purification, circulation, configuration, and aggravation multifunctional system.
• Five levels of purification, full process control, full explosion-proof circuit.
• Sandblasting and rust removal, spraying marine special paint, thorough corrosion protection, durable.
1000 meters Solids Control System Details
The solids control system of HL Petroleum can ensure the smooth progress of mud purification, circulation, preparation, weighing and storage. It also has the solid phase control capability of the mud purification system, which can meet the technical requirements of 1000-7000m drilling.
1000 meters solids control system supporting
Number |
Select |
Equipment |
Parameters |
Quantity |
1 |
Must match |
The volume is not less than 80 m3 |
1set |
|
2 |
Processing capacity is not less than 126m3/h |
2sets |
||
3 |
Sand pump capacity:180m3/h |
1set |
||
4 |
Optional |
Processing capacity 200㎥/h |
1set |
|
5 |
Processing capacity 200㎥/h |
1set |
Note: The above content is for reference only, and the actual number of packages depends on site conditions.
1. Drilling rigs with a drilling depth of less than 2000m should be equipped with drilling fluid tanks, vibrating screens and mixing and weighing devices.
2. Drilling rigs with a drilling depth of more than 2000m (including 2000m) should be equipped with drilling fluid tanks, vibrating screens, desanders, desilters and mixing and weighing devices.
3. According to the requirements of drilling technology and drilling fluid system, it can also be equipped with deaerator, centrifuge and other equipment.
4. Drilling rigs engaged in exploration wells, gas wells and oil wells with a gas-oil ratio above 300 should be equipped with degassers, centrifuges and shear pumps.
5. According to the actual drilling process requirements, special operation equipment is required, including H2S drilling, underbalanced drilling, etc.
6. Each mud tank should be equipped with corresponding mud agitator, mud gun and lighting system according to drilling process requirements.