3000 meters Solids Control System
3000 meters Solids Control System
3000 meters Solids Control System
Home > Drilling Fluid Solids Control System

3000 meters Solids Control System


Product details

Drilling fluid solids control system is a key equipment used to separate and treat rock nitrate, silt and other particles in drilling fluid, so as to ensure the performance of drilling fluid and realize circular storage. The system is equipped with weighted mixing device, pouring device and chemical agent filling device to improve the physical and chemical properties of drilling fluid to meet the requirements of drilling operations. The solids control system divides the solids in the drilling fluid into useful solids (such as barite powder, bentonite and chemical treatment agents, etc.) and useless solids (such as drilling cuttings, sand grains, inferior bentonite, etc.). It is divided into four-stage solids control and five-stage purification systems according to different technical requirements, which can effectively ensure the use of drilling mud and is suitable for drilling at a depth of 1000-7000m.
3000 meters solids control system
The Solids Control System of HL Petroleum has excellent functions, which can ensure the smooth progress of mud purification, circulation, preparation, weighing and storage. In addition, the system also has a strong mud purification capacity, which can meet the technical requirements of 1000-7000m drilling.

3000 meters solids control system supporting

Number

Select

Equipment

Parameters

Quantity

1

Must match

Mud tank

The volume is not less than 165 m3

The storage tank volume is not less than 80 m3

1set

2

Mud shale shaker

Processing capacity is not less than 181.5m3/h

2sets

3

Desander

Processing capacity is not less than 181.5m3/h

1set

4

Desilter

Processing capacity is not less than 181.5m3/h

1set

5

Jet mud mixer

Sand pump capacity:200m3/h
Sand pump lift:36 m

1set

6

Shear pump

Capacity:155 m3/h
Lift:32 m

1set

7

Feeding pump

Capacity:150 m3/h
Lift:28 m

1set

8

Optional

Degasser

Processing capacity is not less than 181.5 m3/h

1set

9

Medium speed centrifuge

Capacity: 40m3/h
Separated particles:5μm~7μm

1set


Note: The above content is for reference only, and the actual number of packages depends on site conditions.

1. Drilling rigs with a drilling depth of less than 2000m should be equipped with drilling fluid tanks, vibrating screens and mixing and weighing devices.

2. Drilling rigs with a drilling depth of more than 2000m (including 2000m) should be equipped with drilling fluid tanks, vibrating screens, desanders, desilters and mixing and weighing devices.

3. According to the requirements of drilling technology and drilling fluid system, it can also be equipped with deaerator, centrifuge and other equipment.

4. Drilling rigs engaged in exploration wells, gas wells and oil wells with a gas-oil ratio above 300 should be equipped with degassers, centrifuges and shear pumps.

5. According to the actual drilling process requirements, special operation equipment is required, including H2S drilling, underbalanced drilling, etc.

6. Each mud tank should be equipped with corresponding mud agitator, mud gun and lighting system according to drilling process requirements.

Why choose us?

factory

HL Factory

HRK Factory

HRK Factory

HRK Factory

About Shipping

shipping

BOOKING TIST PRODUCT ONLINE
E-mail: sales@hlsolidscontrol.com
Prev: 1000 meters Solids Control System

Solids Control Equipment

sales@hlsolidscontrol.com

©2024 Xi'an HL Petroleum Equipment Co., Ltd.

HomeHome
EmailE-mail
ProductBOOKING