• Solids Control EquipmentMud Shale Shaker Degasser Mud Cleaner Centrifuge Mud Agitator Mud Gun Jet Mud Mixer Centrifugal Pump Shear Pump Spray Pump Vacuum Pump Mud Gas Separator Ignition Drilling Cuttings Dryer Filter Press Conveyor
  • Mud Treatment SystemDrilling Fluid Solids Control System Water-based Mud Treatment System Oil based Mud Treatment System Trenchless Mud Treatment System Mud Mixing System Drilling Fluid Cooling System Truck mounted Mud Circulation System Barite Recovery System
  • Tank and Steel StructureRig Mat Elevated Diesel Tank Nested Water Tank Fracturing Fluid Tank Drilling Pipe Basket Drill Cuttings Box Mud Storage Tank
  • Drilling Tools and Spare PartsMud Shale Shaker Spare Parts Centrifugal Pump Spare Parts Mud Pump Spare Parts Centrifuge Spare Parts Mud Tank Bottom Valve Mud Hopper Mud Tank Level Alarm Polyurethane Cyclone Electric Motor WPS Reducer Mud Tank Union Explosion-proof Water Tank Heater
  • ApplicationOilfield DrillingGas Geothermal DrillingTrenchless HDDDrilling Waste TreatmentSewage TreatmentTunnel ShieldTailings Dry Discharge
  • Contact us
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    Phone: 86-29-88680837
    Mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province

    How to install the drilling mud agitator?

    Time: 2023-08-03 Source: HL Petroleum Author: hlsolidscontrol
    When installing the drilling mud agitator, make sure that the equipment is lifted horizontally and placed on the installation position stably. Connect the agitator to the tank with 4 M16 bolts, and tighten the fixing bolts to ensure that the agitator is stable.

    The connecting bolts of the rigid coupling must be equipped with spring washers and tightened to prevent the deflection of the pulsator shaft and reduce the wear or bearing damage of the worm gear/worm pair in the reducer.
    drilling mud agitator  drilling fluid mud agitator
    Usually, when the depth of the mud tank is equal to or greater than 2400mm, auxiliary support (commonly known as "stabilizer") will be attached. When installing the centralizer, put it on the lower end of the pulsator shaft, and after connecting the bolts of the driving disc and the driven plate, evenly adjust the radial clearance between the inner hole of the centralizer sleeve and the outer circle of the cantilever end of the pulsator shaft. Finally, weld the lower parts of the three supporting ribs firmly to the bottom of the tank. If the bottom of the mud tank is an inclined floor, it is necessary to add a correction block between the support rib of the centralizer and the inclined floor, so that the inner hole of the upper sleeve of the centralizer is on the same axis as the wave wheel shaft as much as possible.

    After the installation is completed, ensure that the drilling mud agitator is powered on and running without any abnormal phenomena such as abnormal noise, sticking, and excessive temperature of the reducer. If an abnormality is found, stop the machine immediately to check the cause, and then restart after troubleshooting. It is important to maintain the safe operation and performance of the equipment.

    HL Petroleum is a solids control equipment manufacturer integrating R&D, production, sales and service. We have more than 20 years of research, design and manufacturing experience.The main products include Mud Shale Shakers,Vacuum Degasser, Mud Cleaner, Centrifuge, mud agitators, Mud Gun, jet Mud Mixer, Centrifugal Pumps, Shear Pumps, Spray Pumps,Vacuum Pump, Mud Gas Separator etc. 

    HL Petroleum  mud agitator Long life & Competitive price.  Design and development,Quick quote and Fast delivery.If you are interested in our equipment,please contact us.Contact us for more discount information.
    Tel: 86-29-88680837
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    E-mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
    ©2023 Xi'an HL Petroleum Equipment Co., Ltd.