How to install the shear mixing device?
Time: 2023-08-02 Source: HL Petroleum Author: hlsolidscontrol
Installing a shear mixing device is a process that involves placing the equipment, connecting pipes and connecting power. So how to install the shear mixing device:
1. Foundation preparation:
According to the site conditions, level the foundation at an appropriate position to ensure that the foundation is at the same level as the mud tank foundation. This ensures that the device is stable and not prone to tipping or wobbling.
2, Equipment placement:
Place the shear mixing device on the prepared foundation, making sure the equipment is level. You need to choose a suitable placement according to the size and weight of the equipment.
3. Pump suction connection:
Use a rubber hose to connect the suction port of the pump to the mud tank. Make sure the connections are tight to prevent leakage or air bubbles from entering the system.
4. Power on:
Plug the device into the correct electrical outlet and turn on the power. Before connecting the power, make sure the power switch of the device is off.
5. Check shear pump steering:
In some shear mixing devices, the steering of the pump is very important to ensure that the slurry is properly sheared and mixed. Therefore, after turning on the power, move the switch to observe whether the steering of the shear pump is correct. If the steering is incorrect, it is necessary to change the connection method of the power phase wire until the steering is correct.
6. Run the test:
After confirming that everything is installed correctly, the operation test of the equipment can be carried out. Turn on the shear mixing device, and observe whether the device works normally and whether the pump can suck and discharge mud normally. At the same time, make sure that the device is running stably without abnormal vibration or noise.
7. Perform maintenance:
Once the shear mixing device is installed and operating normally, regular maintenance and maintenance must be carried out in accordance with the equipment manual and manufacturer's requirements. This can ensure the long-term stable operation of the equipment and prolong the service life of the equipment.
1. Foundation preparation:
According to the site conditions, level the foundation at an appropriate position to ensure that the foundation is at the same level as the mud tank foundation. This ensures that the device is stable and not prone to tipping or wobbling.
2, Equipment placement:
Place the shear mixing device on the prepared foundation, making sure the equipment is level. You need to choose a suitable placement according to the size and weight of the equipment.
3. Pump suction connection:
Use a rubber hose to connect the suction port of the pump to the mud tank. Make sure the connections are tight to prevent leakage or air bubbles from entering the system.
4. Power on:
Plug the device into the correct electrical outlet and turn on the power. Before connecting the power, make sure the power switch of the device is off.
5. Check shear pump steering:
In some shear mixing devices, the steering of the pump is very important to ensure that the slurry is properly sheared and mixed. Therefore, after turning on the power, move the switch to observe whether the steering of the shear pump is correct. If the steering is incorrect, it is necessary to change the connection method of the power phase wire until the steering is correct.
6. Run the test:
After confirming that everything is installed correctly, the operation test of the equipment can be carried out. Turn on the shear mixing device, and observe whether the device works normally and whether the pump can suck and discharge mud normally. At the same time, make sure that the device is running stably without abnormal vibration or noise.
7. Perform maintenance:
Once the shear mixing device is installed and operating normally, regular maintenance and maintenance must be carried out in accordance with the equipment manual and manufacturer's requirements. This can ensure the long-term stable operation of the equipment and prolong the service life of the equipment.