• Solids Control EquipmentMud Shale Shaker Degasser Mud Cleaner Centrifuge Mud Agitator Mud Gun Jet Mud Mixer Centrifugal Pump Shear Pump Spray Pump Vacuum Pump Mud Gas Separator Ignition Drilling Cuttings Dryer Filter Press Conveyor
  • Mud Treatment SystemDrilling Fluid Solids Control System Water-based Mud Treatment System Oil based Mud Treatment System Trenchless Mud Treatment System Mud Mixing System Drilling Fluid Cooling System Truck mounted Mud Circulation System Barite Recovery System
  • Tank and Steel StructureRig Mat Elevated Diesel Tank Nested Water Tank Fracturing Fluid Tank Drilling Pipe Basket Drill Cuttings Box Mud Storage Tank
  • Drilling Tools and Spare PartsMud Shale Shaker Spare Parts Centrifugal Pump Spare Parts Mud Pump Spare Parts Centrifuge Spare Parts Mud Tank Bottom Valve Mud Hopper Mud Tank Level Alarm Polyurethane Cyclone Electric Motor WPS Reducer Mud Tank Union Explosion-proof Water Tank Heater
  • ApplicationOilfield DrillingGas Geothermal DrillingTrenchless HDDDrilling Waste TreatmentSewage TreatmentTunnel ShieldTailings Dry Discharge
  • Contact us
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    Phone: 86-29-88680837
    Mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province

    How is mud purification of geothermal wells operated HL Petroleum

    Time: 2023-06-15 Source: HL Petroleum Author: hlsolidscontrol

    What is the geothermal well mud? How is the geothermal well mud purified? What are the characteristics of the geothermal well mud? Geothermal well mud.....and so on. Today, the editor of HL Petroleum will introduce to you, the geothermal well mud and what solids control equipment is needed for purification?

    Geothermal well mud has the following characteristics:

    1) Control blowout: Not suitable for using high-density mud

    2) Mud treatment agent: Due to the high temperature of the geothermal well, the mud treatment agent should be guaranteed to be above 150°C to maintain stable mud performance.

    3) Heavy metal preparations: It is strictly prohibited to use to prevent environmental pollution.

    4) Fine solid phase particles: ensure that the content of solid phase particles is the lowest value.

    5) Mud treatment equipment: must be equipped with solid phase control equipment

    Requirements for the mud use system of geothermal wells:

    1) Conventional mud is used for drilling into the surface overburden.

    2) Use low-solid mud from the bottom of the surface to above the thermal reservoir.

    3) High-quality mud is used for drilling through hot water type thermal reservoirs, low-end bentonite mud is used for well temperatures below 200°C; sepiolite mud is used for well temperatures greater than 200°C.

    According to the above-mentioned characteristics and application requirements of geothermal well mud, the most important principle of geothermal well mud treatment is to meet the temperature resistance requirements of the mud.

    The equipment of the geothermal well mud solids control treatment system includes: mud shaker, cyclone desander, desilter, mud cleaner, centrifuge, sand pump, shear pump, submerged slurry pump, mud agitator, jet Mud mixing devices, mud guns, grit tanks, purification tanks and other equipment, as well as integrated 120 cubic meters, 240 cubic meters and other geothermal well mud solids control systems. Through the treatment of geothermal well mud solids control equipment, the solid content in the mud can be effectively controlled, the solid particles in the mud can be controlled below 5μm-15μm, and the life of the mud pump and drilling rig can be prolonged, and the drilling speed can be increased.

    Xi'an HL can produce the equipment needed for mud purification of geothermal wells, welcome to send inquiry to us: sales@hlsolidscontrol.com if you have purchase request of these solids control equipment.

    Tel: 86-29-88680837
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    E-mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
    ©2023 Xi'an HL Petroleum Equipment Co., Ltd.