• Solids Control EquipmentMud Shale Shaker Degasser Mud Cleaner Centrifuge Mud Agitator Mud Gun Jet Mud Mixer Centrifugal Pump Shear Pump Spray Pump Vacuum Pump Mud Gas Separator Ignition Drilling Cuttings Dryer Filter Press Conveyor
  • Mud Treatment SystemDrilling Fluid Solids Control System Water-based Mud Treatment System Oil based Mud Treatment System Trenchless Mud Treatment System Mud Mixing System Drilling Fluid Cooling System Truck mounted Mud Circulation System Barite Recovery System
  • Tank and Steel StructureRig Mat Elevated Diesel Tank Nested Water Tank Fracturing Fluid Tank Drilling Pipe Basket Drill Cuttings Box Mud Storage Tank
  • Drilling Tools and Spare PartsMud Shale Shaker Spare Parts Centrifugal Pump Spare Parts Mud Pump Spare Parts Centrifuge Spare Parts Mud Tank Bottom Valve Mud Hopper Mud Tank Level Alarm Polyurethane Cyclone Electric Motor WPS Reducer Mud Tank Union Explosion-proof Water Tank Heater
  • ApplicationOilfield DrillingGas Geothermal DrillingTrenchless HDDDrilling Waste TreatmentSewage TreatmentTunnel ShieldTailings Dry Discharge
  • Contact us
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    Phone: 86-29-88680837
    Mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province

    What are the Shale Shaker operation guidelines

    Time: 2023-06-15 Source: Shale Shaker Author: hlsolidscontrol

    When the drilling fluid circulates, the Mud Shale Shaker must be continuously vibrated. If the Shale Shaker does not vibrate, the drill cuttings cannot be removed.

    (1) The drilling fluid must flow through most of the screen cloth area. If the drilling fluid can only cover 1/4 to 1/3 of the screen cloth, it means that the number of screen cloths used is too large.

    (2) The holes in the screen cloth must be repaired or replaced, and the holes in the flat screen cloth can be blocked. Install the screen cloth according to the installation procedure provided by the manufacturer. When the drilling fluid flows through the holes on the screen cloth, the drill cuttings in the cloth cannot be separated.

    (3) The screen cloth must be replaced as soon as possible. The vibrating screen stops running during replacement, which will reduce the amount of solids removed from the drilling fluid.

    (4) Before starting to replace the screen cloth, place the tools and prepare a new screen cloth. If possible, an assistant can be provided.

    (5) If possible, it is best to replace the screen cloth when connecting a single one. In some emergency situations, the drilling engineer may stop the pump (or reduce the pump speed) and stop the cobalt when changing the screen cloth.

    (6) In order to improve the service life of the screen cloth under tension-free conditions, it is necessary to ensure that every part of the screen cloth tension system, such as rubber supports, nuts, bolts, springs, etc., are properly installed and not deformed.

    (7) Check the operating environment of the vibration isolation element and the supporting parts of the screen cloth. If it is damaged or excessively fatigued, it should be replaced in time.

    (8) Water cannot be added directly to the liquid storage tank (or tail tank) or on the vibrating screen cloth, water can only be added to the next stage of the process.

    (9) Unless the loop is lost, the entire process must pass through the vibrating screen, even if it is bypassed for a short time.

    (10) Clean the screen cloth before each start to prevent the drilling fluid from covering the dry screen cloth.

    The drilling fluid in the reserve tank cannot be directly fed into the circulation system or poured directly into the grit tank. If so, it will cause the cuttings to enter the circulation system, and when the next drill bit is used to start drilling, it will block the desilter.

    Xi'an HL produced various Shale Shaker, which can also be customized according to customer needs, welcome to send inquiry to us: sales@hlsolidscontrol.com if you want to know more about it.

    Tel: 86-29-88680837
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    E-mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
    ©2023 Xi'an HL Petroleum Equipment Co., Ltd.