• Solids Control EquipmentMud Shale Shaker Degasser Mud Cleaner Centrifuge Mud Agitator Mud Gun Jet Mud Mixer Centrifugal Pump Shear Pump Spray Pump Vacuum Pump Mud Gas Separator Ignition Drilling Cuttings Dryer Filter Press Conveyor
  • Mud Treatment SystemDrilling Fluid Solids Control System Water-based Mud Treatment System Oil based Mud Treatment System Trenchless Mud Treatment System Mud Mixing System Drilling Fluid Cooling System Truck mounted Mud Circulation System Barite Recovery System
  • Tank and Steel StructureRig Mat Elevated Diesel Tank Nested Water Tank Fracturing Fluid Tank Drilling Pipe Basket Drill Cuttings Box Mud Storage Tank
  • Drilling Tools and Spare PartsMud Shale Shaker Spare Parts Centrifugal Pump Spare Parts Mud Pump Spare Parts Centrifuge Spare Parts Mud Tank Bottom Valve Mud Hopper Mud Tank Level Alarm Polyurethane Cyclone Electric Motor WPS Reducer Mud Tank Union Explosion-proof Water Tank Heater
  • ApplicationOilfield DrillingGas Geothermal DrillingTrenchless HDDDrilling Waste TreatmentSewage TreatmentTunnel ShieldTailings Dry Discharge
  • Contact us
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    Phone: 86-29-88680837
    Mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province

    What are the rig mat production requirements?

    Time: 2023-07-31 Source: Author: hlsolidscontrol
    Rig mat is a gasket used to support and stabilize drilling rig equipment. In order to ensure its quality and performance, it needs to be produced according to certain production requirements.What are the rig mat production requirements? The following are the production requirements of rig mat:
    The main structure of the rig mat is usually made of steel. In order to ensure the structural strength and stability, it is necessary to select the mold steel that meets the standard specifications.
    The wood part embedded in the rig mat needs to be made of hard and water-resistant larch material. This is due to environmental factors such as water or humidity that may be present at the drilling rig site, and the water resistance of the larch ensures the stability and durability of the embedded wood.
    The embedded wood needs to be finished and processed into square logs of prescribed dimensions. This ensures a stronger bond between the embedded part and the rig mat.
    rig mat  rig mats
    Embedded wood is preservative treated according to the national standard GB9221-88 for railway sleeper wood anticorrosion. This standard requires that the depth of oil immersion be greater than 10mm to improve the weather resistance and corrosion resistance of wood.
    The local compressive strength of the transverse grain is greater than 40kg/cm2: ensure that the embedded wood has sufficient strength and load-bearing capacity to support the weight and working load of the drilling rig equipment.
    In order to prevent the wood from being attacked by ants and insects, it is necessary to carry out corresponding ant-proof treatment.
    Specific rig mat production requirements may vary due to different production standards, uses and specifications. Therefore, in the actual production process, it will be produced according to relevant standards and requirements to ensure that the quality and performance of the rig mat meet expectations.
    Tel: 86-29-88680837
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    E-mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
    ©2023 Xi'an HL Petroleum Equipment Co., Ltd.