• Solids Control EquipmentMud Shale Shaker Degasser Mud Cleaner Centrifuge Mud Agitator Mud Gun Jet Mud Mixer Centrifugal Pump Shear Pump Spray Pump Vacuum Pump Mud Gas Separator Ignition Drilling Cuttings Dryer Filter Press Conveyor
  • Mud Treatment SystemDrilling Fluid Solids Control System Water-based Mud Treatment System Oil based Mud Treatment System Trenchless Mud Treatment System Mud Mixing System Drilling Fluid Cooling System Truck mounted Mud Circulation System Barite Recovery System
  • Tank and Steel StructureRig Mat Elevated Diesel Tank Nested Water Tank Fracturing Fluid Tank Drilling Pipe Basket Drill Cuttings Box Mud Storage Tank
  • Drilling Tools and Spare PartsMud Shale Shaker Spare Parts Centrifugal Pump Spare Parts Mud Pump Spare Parts Centrifuge Spare Parts Mud Tank Bottom Valve Mud Hopper Mud Tank Level Alarm Polyurethane Cyclone Electric Motor WPS Reducer Mud Tank Union Explosion-proof Water Tank Heater
  • ApplicationOilfield DrillingGas Geothermal DrillingTrenchless HDDDrilling Waste TreatmentSewage TreatmentTunnel ShieldTailings Dry Discharge
  • Contact us
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    Phone: 86-29-88680837
    Mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province

    The work procedure for the electronic ignition device used in oilfield drilling

    Time: 2023-07-17 Source: Author: hlsolidscontrol
    The work procedure for the electronic ignition device used in oilfield drilling is as follows:
    Step 1: Convey combustible gas to the intake of the burner (torch) installed in a safe area through pipelines.
    Step 2: Connect and start the electronic ignition device's current conversion and voltage amplification electronic circuit.
    Step 3: Open the liquefied gas cylinder and use the electronic ignition device to ignite the igniter tube (first-stage ignition), or directly open the igniter gas valve for purging and use the electronic ignition device to ignite the igniter tube (first-stage ignition).
    Step 4: Open the gas blowdown valve, and the burning igniter tube will ignite the blowdown gas (second-stage ignition).
    Step 5: Close the liquefied gas cylinder and extinguish the igniter tube, allowing the combustible blowdown gas to burn freely.
    The work procedure for the electronic ignition device
    Through this work procedure, the electronic ignition device effectively ignites the combustible gas in oilfield drilling, allowing it to burn and release energy in a safe and efficient manner. This advanced ignition device ensures the safety and efficiency of the drilling process, providing reliable technical support for oilfield extraction.
    Tel: 86-29-88680837
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    E-mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
    ©2023 Xi'an HL Petroleum Equipment Co., Ltd.