Oil rig solids control system was ordered by a customer in Heilongjiang
Time: 2023-08-01 Source: HL Petroleum Author: hlsolidscontrol
A customer in Heilongjiang has successfully ordered a set of oil rig solids control system from our company. This customized oil rig solids control system is an important supporting equipment in drilling operations. Its main function is to deal with solid phase particles in drilling fluid. Ensure the stable performance of drilling fluid, so that mud pumps and other drilling equipment can run smoothly.
The customized oil rig solids control system is suitable for the scene of 3000 meters, which includes a series of necessary equipment, such as large-capacity mud tank (volume not less than 165m3, storage tank volume not less than 80m3), high-capacity Shale shaker (2 sets, processing capacity not less than 181.5 m3/h), desander (1 set, processing capacity not less than 181.5 m3/h), desilter (1 set, processing capacity not less than 181.5 m3/h) etc. to ensure that the solid phase particles in the drilling fluid can be effectively removed and treated. In addition, the jet mixing device (1 set) is equipped with high-performance sand pump (displacement 200 m3/h, head 36 m), shear pump (displacement 155 m3/h, head 32 m) and grouting pump (displacement 150 m3/h, head 28 m), making the adjustment and delivery of drilling fluid more flexible and efficient.
As an additional option, the customer also chose a vacuum degasser (1 set, processing capacity not less than 181.5m3/h) and a medium-speed centrifuge (1 set, processing capacity 40m3/h, separation particle size 5μm~7μm), which will Further improve the performance and reliability of the solids control system.
HL Petroleum has always been committed to providing customers with the best quality petroleum equipment and solutions. Through close cooperation with the customer, the company's professional team has customized a perfect oil rig solids control system according to the customer's specific needs and geological conditions, so as to ensure the smooth progress of its drilling operations, and in terms of cost control and efficiency improvement Achieve great results.
The customized oil rig solids control system is suitable for the scene of 3000 meters, which includes a series of necessary equipment, such as large-capacity mud tank (volume not less than 165m3, storage tank volume not less than 80m3), high-capacity Shale shaker (2 sets, processing capacity not less than 181.5 m3/h), desander (1 set, processing capacity not less than 181.5 m3/h), desilter (1 set, processing capacity not less than 181.5 m3/h) etc. to ensure that the solid phase particles in the drilling fluid can be effectively removed and treated. In addition, the jet mixing device (1 set) is equipped with high-performance sand pump (displacement 200 m3/h, head 36 m), shear pump (displacement 155 m3/h, head 32 m) and grouting pump (displacement 150 m3/h, head 28 m), making the adjustment and delivery of drilling fluid more flexible and efficient.
As an additional option, the customer also chose a vacuum degasser (1 set, processing capacity not less than 181.5m3/h) and a medium-speed centrifuge (1 set, processing capacity 40m3/h, separation particle size 5μm~7μm), which will Further improve the performance and reliability of the solids control system.
HL Petroleum has always been committed to providing customers with the best quality petroleum equipment and solutions. Through close cooperation with the customer, the company's professional team has customized a perfect oil rig solids control system according to the customer's specific needs and geological conditions, so as to ensure the smooth progress of its drilling operations, and in terms of cost control and efficiency improvement Achieve great results.