• Solids Control EquipmentMud Shale Shaker Degasser Mud Cleaner Centrifuge Mud Agitator Mud Gun Jet Mud Mixer Centrifugal Pump Shear Pump Spray Pump Vacuum Pump Mud Gas Separator Ignition Drilling Cuttings Dryer Filter Press Conveyor
  • Mud Treatment SystemDrilling Fluid Solids Control System Water-based Mud Treatment System Oil based Mud Treatment System Trenchless Mud Treatment System Mud Mixing System Drilling Fluid Cooling System Truck mounted Mud Circulation System Barite Recovery System
  • Tank and Steel StructureRig Mat Elevated Diesel Tank Nested Water Tank Fracturing Fluid Tank Drilling Pipe Basket Drill Cuttings Box Mud Storage Tank
  • Drilling Tools and Spare PartsMud Shale Shaker Spare Parts Centrifugal Pump Spare Parts Mud Pump Spare Parts Centrifuge Spare Parts Mud Tank Bottom Valve Mud Hopper Mud Tank Level Alarm Polyurethane Cyclone Electric Motor WPS Reducer Mud Tank Union Explosion-proof Water Tank Heater
  • ApplicationOilfield DrillingGas Geothermal DrillingTrenchless HDDDrilling Waste TreatmentSewage TreatmentTunnel ShieldTailings Dry Discharge
  • Contact us
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    Phone: 86-29-88680837
    Mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province

    How do you set up an agitator

    Time: 2024-08-10 Source: Author: hlsolidscontrol

    The following are the general installation steps for mud agitators:

    1. Preparation: Before installation, you need to carefully read the installation manual of the agitator to understand the installation requirements and precautions. At the same time, ensure that the installation site has the required tools and equipment, and clean up the debris around the installation location.
    How do you set up an agitator

    2. Install the bracket: Install the bracket of the agitator according to the model and installation requirements of the agitator. The bracket should be installed firmly and reliably to withstand the weight of the agitator and the vibration during operation.

    3. Install the agitator body: Lift the main body of the agitator, slowly place it on the bracket, and adjust it as needed to ensure the horizontality and verticality of the agitator.

    4. Connect the power supply and cable: Connect the corresponding power supply and cable according to the power supply requirements of the agitator. Before connecting the power supply, ensure that the power supply meets the rated voltage and frequency requirements of the agitator, and check the insulation performance of the cable.

    5. Connect the pipeline: If the agitator needs to be connected to other equipment or pipelines, it should be connected according to the corresponding connection requirements. Pay attention to the sealing performance when connecting to avoid leakage.

    6. Debugging and inspection: After the installation is completed, debugging and inspection should be carried out to ensure the normal operation of the agitator. During debugging, the speed, direction, stirring effect and other parameters of the agitator should be checked and necessary adjustments should be made. During the inspection, attention should be paid to the running stability, noise level, vibration of the agitator, etc. If there is any abnormality, it should be eliminated in time.

    7. Trial operation: After the debugging and inspection are completed, a trial operation is carried out. During the trial operation, the agitator should be operated according to the operating procedures, the operation of the agitator should be observed, and the relevant data should be recorded. The trial operation time is generally several hours to one day to ensure the stability and reliability of the agitator.

    Tel: 86-29-88680837
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    E-mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
    ©2023 Xi'an HL Petroleum Equipment Co., Ltd.