• Solids Control EquipmentMud Shale Shaker Degasser Mud Cleaner Centrifuge Mud Agitator Mud Gun Jet Mud Mixer Centrifugal Pump Shear Pump Spray Pump Vacuum Pump Mud Gas Separator Ignition Drilling Cuttings Dryer Filter Press Conveyor
  • Mud Treatment SystemDrilling Fluid Solids Control System Water-based Mud Treatment System Oil based Mud Treatment System Trenchless Mud Treatment System Mud Mixing System Drilling Fluid Cooling System Truck mounted Mud Circulation System Barite Recovery System
  • Tank and Steel StructureRig Mat Elevated Diesel Tank Nested Water Tank Fracturing Fluid Tank Drilling Pipe Basket Drill Cuttings Box Mud Storage Tank
  • Drilling Tools and Spare PartsMud Shale Shaker Spare Parts Centrifugal Pump Spare Parts Mud Pump Spare Parts Centrifuge Spare Parts Mud Tank Bottom Valve Mud Hopper Mud Tank Level Alarm Polyurethane Cyclone Electric Motor WPS Reducer Mud Tank Union Explosion-proof Water Tank Heater
  • ApplicationOilfield DrillingGas Geothermal DrillingTrenchless HDDDrilling Waste TreatmentSewage TreatmentTunnel ShieldTailings Dry Discharge
  • Contact us
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    Phone: 86-29-88680837
    Mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province

    What should be paid attention to when assembling equipment for mud circulation tank

    Time: 2023-05-16 Source: Solids Control System Author: Cici

    What should be paid attention to when assembling equipment for mud circulation tank?

    1. Wear labor protection equipment.

    2. Work with a certificate.

    3. The connecting pipeline is connected correctly, and the valve opens slowly.

    4. Pay attention to crushing, etc.

    5. Use tools to place them at a concentrated point.
    mud circulation tank
     

    Precautions for operation of mud tank equipment:

    1. All mud agitator should be checked for normal lubricating oil before use. Those who do not meet the standard should add lubricating oil.

    2. All sand pumps and tank pumps should be checked before starting to ensure that they do not run in reverse.

    3. The system can enter the working state only after the test runs normally.

    4. Pay attention to electric shock during construction.

    5. Recheck whether the sealing between the hose and the quick connector is intact.

    6. Pay attention to anti-skid and anti-drop when working at heights.

    7. Prevent blockage of debris pipeline.

    8. Make a good operation record. 

    Tel: 86-29-88680837
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    E-mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
    ©2023 Xi'an HL Petroleum Equipment Co., Ltd.