• Solids Control EquipmentMud Shale Shaker Degasser Mud Cleaner Centrifuge Mud Agitator Mud Gun Jet Mud Mixer Centrifugal Pump Shear Pump Spray Pump Vacuum Pump Mud Gas Separator Ignition Drilling Cuttings Dryer Filter Press Conveyor
  • Mud Treatment SystemDrilling Fluid Solids Control System Water-based Mud Treatment System Oil based Mud Treatment System Trenchless Mud Treatment System Mud Mixing System Drilling Fluid Cooling System Truck mounted Mud Circulation System Barite Recovery System
  • Tank and Steel StructureRig Mat Elevated Diesel Tank Nested Water Tank Fracturing Fluid Tank Drilling Pipe Basket Drill Cuttings Box Mud Storage Tank
  • Drilling Tools and Spare PartsMud Shale Shaker Spare Parts Centrifugal Pump Spare Parts Mud Pump Spare Parts Centrifuge Spare Parts Mud Tank Bottom Valve Mud Hopper Mud Tank Level Alarm Polyurethane Cyclone Electric Motor WPS Reducer Mud Tank Union Explosion-proof Water Tank Heater
  • ApplicationOilfield DrillingGas Geothermal DrillingTrenchless HDDDrilling Waste TreatmentSewage TreatmentTunnel ShieldTailings Dry Discharge
  • Contact us
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    Phone: 86-29-88680837
    Mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province

    How to deal with the mud of the cast-in-place pile

    Time: 2023-05-29 Source: Author: hlsolidscontrol

    The current piling mud treatment method is to use tank trucks to transport the on-site mud water to the outskirts garbage dump to let it dry naturally. This way of handling is primitive and backward, which has caused many problems. First, the cost is high and the efficiency is low. When the construction is tight, the day and night transportation of tank trucks cannot meet the construction schedule requirements. Second, the construction site environment is bad, and the overflow of mud water makes it difficult to get in. The engineering team often causes pipelines due to the leakage of mud water into the sewer. Blocked and suffered huge fines. In addition, the tank truck often pollutes the city's appearance and environment due to the leakage of muddy water on the main roads of the city during transportation.

    Pile-driving mud treatment process: After the rotary drilling rig is excavated, the mud discharged from the mud pipe is purified by a decanter centrifuge. If the sand content of the treated mud water meets the requirements, it can be directly discharged into the sedimentation tank for overflow sedimentation. Otherwise, it will be further processed by the treatment equipment of the dosing system, and then discharged into the sedimentation tank for overflow sedimentation.

    After treatment and dosing, the sifted ballast soil is transported to the designated dump site for storage.

    After the mud overflow enters the adjustment tank, if the amount of mud is excessive, the mud can be discharged into the abandoned slurry tank for storage. When the amount of mud exceeds the capacity of the abandoned slurry tank, it will be pumped to a nearby transportation carrier and transported to the abandoned slurry yard; When the demand is met, the pumping machine can be used for artificial pulping to supplement the pulp.

    When the slurry concentration of the adjustment tank meets the requirements, it should be directly pumped by the slurry pump to the rotary drilling rig; if the slurry concentration is too strong, add clean water for dilution; if the slurry concentration is too low, the slurry will be adjusted to increase the slurry concentration Pump to the rotary drilling rig.

    According to the flow of piling mud, it is treated with mud discharge equipment first, and then discharged into the sedimentation tank for overflow process. The piling mud treatment system can choose different types of decanter centrifuges according to the requirements, and the purification and sand removal rate is high, which can reach more than 95%.

    The decanter centrifuge piling mud treatment system has low failure rate, convenient installation, use and maintenance, good use effect, high separation efficiency, and can be adapted to the construction process of various piling (pile foundation) construction in different strata.

    The advantages of advanced motor power structure, high degree of generalization, reliable operation and convenient disassembly and maintenance; ensure the long-term normal operation of the equipment. The electrical control adopts a frequency conversion start control system (PLC can be used to realize automatic control), simple wiring, strong anti-interference ability, and convenient maintenance and repair. It fully meets the normal excavation capacity of the rotary drilling rig and improves the production efficiency.

    The processed mud is of high quality and the sand content is less than 5%. Because the water content of the soil and sand after the treatment is less than 30%, the discharge volume is greatly reduced, the transportation is convenient, and the transportation cost is saved, ensuring the smooth progress of the piling project and avoiding the piling mud Discharge problems cause environmental pollution, which is conducive to environmental protection.

    Xi'an HL Petroleum Equipment Co., Ltd. is a high-tech enterprise specializing in the production of drilling fluid solid-liquid separation equipment. The main products are: mud shale shaker, mud cleaner, vacuum deaerator, drilling fluid centrifuge, centrifugal sand pump, shear pump, mud agitator, ignition device and steel-wood foundation, etc. Products are widely used in oilfield drilling, trenchless horizontal directional drilling, environmental sewage treatment, coal mine sorting, shield tunneling and bridge construction and many other fields, welcome to send inquiry to us: sales@hlsolidscontrol.com if you have purchase request of these equipment.

    Tel: 86-29-88680837
    WhatsApp: 86-13735815206 / 86-17392256505
    WeChat: 86-13735815206 / 86-17392256505
    E-mail: sales@hlsolidscontrol.com
    Add: Room 804, Building 1, Western Cloud Valley Phase II, Fengxi New Town, Xixian New District, Shaanxi Province
    ©2023 Xi'an HL Petroleum Equipment Co., Ltd.