Oil Rig Solids Control System
Oil Rig Solids Control System
Oil Rig Solids Control System
Home > Drilling Fluid Solids Control System

Oil Rig Solids Control System


Product details

The HGK series solids control system is mainly composed of a five-stage purification device of a mud shale shaker, a vacuum degasser, a mud cleaner and a centrifuge, as well as a mud tank, a cooling water tank, and a supply tank. Equipped with overhead pipeline (from wellhead to mud shaker), mud pump suction pipeline, weight pump suction and discharge pipeline, clean water pipeline, medium pressure mud gun pipeline, tank bottom connecting pipeline, etc. exchange.

solid control system

HGK solids control system is also equipped with auxiliary equipment such as drilling fluid replenishment system, weighting funnel, weighting pump, degreasing liquid supply pump, desilting liquid supply pump, replenishing pump, agitator and so on. In addition, it is also equipped with walkways, ladders, railings and other safety protection devices.

This set of solids control system can ensure the smooth progress of mud purification, circulation, preparation, weighting and storage. It also has the solid phase control ability of the mud purification system and can meet the requirements of 1000-7000m drilling technology.

drilling rig mud tank system
Recommended solids control systems for commonly used oil drilling rigs

5000 meters solids control system supporting

Number

Select

Equipment

Parameters

Quantity

1

Must match

Mud tank

The volume is not less than 200 m3

The storage tank volume is not less than 120 m3

1set

2

Mud shale shaker

Processing capacity is not less than 181.5m3/h

2sets

3 Degasser Processing capacity is not less than 181.5 m3/h 1set

4

Desander

Processing capacity is not less than 181.5 m3/h

1set

5

Desilter

Processing capacity is not less than 181.5 m3/h

1set

6 Medium speed centrifuge Capacity: 40m3 Separated particles:5μm~7μm 1set

7

Jet mud mixer

Sand pump capacity:200m3/h;Sand pump lift:36 m

1set

8

 

Shear pump

Capacity:155 m3/h Lift:32 m

1set

9

 

Feeding pump

Capacity:150 m3/h Lift:28 m

1set

10

Optional

High speed centrifuge

Capacity: 40m3/h Separated particles:3μm~5μm

1set

7000 meters solids control system supporting

Number

Select

Equipment

Parameters

Quantity

1

Must match

Mud tank

The volume is not less than 200 m3

The storage tank volume is not less than 120 m3

1set

2

Mud shale shaker

Processing capacity is not less than 181.5m3/h

2sets

3 Degasser Processing capacity is not less than 181.5 m3/h 1set

4

Desander

Processing capacity is not less than 181.5 m3/h

1set

5

Desilter

Processing capacity is not less than 181.5 m3/h

1set

6 Medium speed centrifuge Capacity: 40m3 Separated particles:5μm~7μm 1set
7 High speed centrifuge Capacity: 40m3 Separated particles:3μm~5μm 1set

8

 

Jet mud mixer

Sand pump capacity:200m3/h;Sand pump lift:36 m

1set

9

 

Shear pump

Capacity:155 m3/h Lift:32 m

1set

10

 

Feeding pump

Capacity:150 m3/h Lift:28 m

1set

Oil Rig Solids Control System

Note: The above content is for reference only, and the actual number of packages depends on site conditions.

1.Drilling rigs below 2000m should be equipped with drilling fluid tanks, vibrating screens and mixed weighting devices.

2. Above 2000m (including 2000m) should be equipped with drilling fluid tank, vibrating screen, de- sander, desilter and mixed weighting device.

3. According to the requirements of drilling technology and drilling fluid system, it can be equipped with deaerator, centrifuge, etc.

4. Drilling rigs engaged in exploration wells, gas wells and oil wells with a gas-to-oil ratio of more than 300 should be equipped with degassers, centrifuges and shear pumps.

5. Special operations (H2S-containing drilling, underbalanced drilling) are equipped according to actual drilling process requirements

6. Each mud tank should be equipped with corresponding mud agitator, mud gun and lighting system according to the drilling process requirements.

Oil Rig Solids Control System Using Site

solid control system drilling


Why choose us?

factory

HL Factory

HRK Factory

HRK Factory

HRK Factory

About Shipping

shipping

BOOKING TIST PRODUCT ONLINE
E-mail: sales@hlsolidscontrol.com
Next: 1000 meters Solids Control System

Solids Control Equipment

summer@ztmineequipment.com

©2023 Xi'an HL Petroleum Equipment Co., Ltd.

HomeHome
EmailE-mail
ProductBOOKING